● PROTOTYPE · NOT THE BUILT PRODUCT built from Partner Networks spec
Prototype data · switch organization with Viewing as

Partner Networks

Combined prototype · R4 design foundation + R4.5 explorations

About this prototype

Round 5 combines April Sousa’s round 4, the foundation for design and behaviour, with selected capabilities from Brian Anderson’s round 4.5 explorations: several networks, private networks, maps and need progress, and an Impact exploration. The Networks page and the Network Overview use the layouts April Sousa selected from round 5’s two layout explorations (2026-10-12; not GIK approval). The earlier layouts stay available as a rollback reference in the Explorer’s option menu.Anything not yet confirmed is marked proposed or exploration.

How to use it. Choose a page, then one of its example states. More detailed scenarios are reached through the prototype itself, or by their direct links. Each example is a preset: a fixed sample state for review that never changes your session. Return to your session to use the prototype live, as the organization chosen in Viewing as. Review notes for each example are below the prototype window.

Preset example · Return to your sessionLive session · your actions are kept until you reset

About this session

Viewing as changes whose perspective you see; it never creates, accepts or shares anything. Clicking the prototype’s own buttons (Create, Send, Accept, Share and so on) changes this session, and it is kept across pages until you reset it. Reset session clears it and starts again from the sample data.

Preset examples never read or change your session. In an example you can search, filter, open previews and move between the network’s Overview, Resources and Members; actions such as Send, Accept, Share and Create only run in your session.

Organization type describes an organization; capabilities and its relationship to each network decide what it is offered. All organizations and records are prototype data.

How to read the review notes
  • Settled: the signed Q4 roadmap’s text, or a decision the spec records as settled, with who and when.
  • First release: in Augusto’s proposed first release (spec section 4). GIK has not agreed to it.
  • Working decision: answered internally in the 2026-10-07 decision interview with Mike Perry. Not confirmed by GIK; a model that implements it is not approval.
  • Working internal direction: from the 2026-10-07 internal review of round 2 (Brian, Simon, Mike), filed as a raw feedback note. Requested design direction, not a numbered decision and not GIK approval.
  • Prototype refinement: a layout or information-architecture change made in the prototype to test usability, such as where a step lives. Not a GIK requirement and not a decision.
  • ▲ Decision pending: still open, with GIK (Shabab, George) or with engineering (Mike).
  • ▲ Conflict: repo sources disagree. The note says what is drawn and why; nothing is resolved here.
  • R5 proposal: added in round 5 for review, often after Brian Anderson’s round 4.5. Not a decision and not GIK approval.
  • Model: ERD round 1 and the ontology’s networks module, proposed and not built. Gap: in the repo, not drawn yet. Later: outside this round.

Prototype data: illustrative organizations, networks and records, in browser-tab state; nothing is sent, saved or shared. Reset session clears it.