● PROTOTYPE · NOT THE BUILT PRODUCT built from Partner Networks spec
Convoy of Hope and Salvation Army (sample)

Partner network: network home and order hand-off

Step 6 of the round-2 walkthrough (scenario S4). Everyone has answered: Kimball shared bottled water and tarps, and Salvation Army joined. The last steps follow Salvation Army from a shared resource into the existing cart.

Your session Product links and buttons use this session and keep it across pages. Viewing as changes who is looking; it never creates, accepts or shares anything.
Preset example. A fixed state for review; controls here demonstrate this step only and never change your session. Return to your session
How to read the review notes
  • Settled: the signed Q4 roadmap’s text, the only source here GIK has agreed to.
  • First release: in Augusto’s proposed first release (spec section 4). GIK has not agreed to it.
  • Working decision: answered internally in the 2026-10-07 decision interview with Mike Perry. Not confirmed by GIK; a model that implements it is not approval.
  • ▲ Decision pending: still open, with GIK (Shabab, George) or with engineering (Mike).
  • ▲ Conflict: repo sources disagree. The note says what is drawn and why; nothing is resolved here.
  • Model: ERD round 1 and the ontology’s networks module, proposed and not built. Gap: in the repo, not drawn yet.

Illustrative organizations and records, in-memory state; nothing is sent, saved or shared. Reloading resets the page.