● PROTOTYPE · NOT THE BUILT PRODUCT built from Partner Networks spec
Convoy of Hope · network admin (sample)

Partner network: invite organizations

Step 2 of the round-2 walkthrough (scenarios S1 and S8). The convener reused Hurricane Lala’s members on Create, so both sample organizations arrive pre-selected. The email steps follow the internal working decision on D12, which the spec text does not yet reflect.

Your session Product links and buttons use this session and keep it across pages. Viewing as changes who is looking; it never creates, accepts or shares anything.
Preset example. A fixed state for review; controls here demonstrate this step only and never change your session. Return to your session
How to read the review notes
  • Settled: the signed Q4 roadmap’s text, the only source here GIK has agreed to.
  • First release: in Augusto’s proposed first release (spec section 4). GIK has not agreed to it.
  • Working decision: answered internally in the 2026-10-07 decision interview with Mike Perry. Not confirmed by GIK; a model that implements it is not approval.
  • ▲ Decision pending: still open, with GIK (Shabab, George) or with engineering (Mike).
  • ▲ Conflict: repo sources disagree. The note says what is drawn and why; nothing is resolved here.
  • Model: ERD round 1 and the ontology’s networks module, proposed and not built. Gap: in the repo, not drawn yet.

Illustrative organizations and records, in-memory state; nothing is sent, saved or shared. Reloading resets the page.